On-Premises Migration

On-premises to cloud, lifted and shifted safely.

Move ageing servers and your whole data centre into the cloud with downtime planned to a minimum. We map every dependency first, decide rehost or replatform per workload, cut over in tested waves, then decommission the old kit for good.

Full dependency mappingPhased, tested cutoverRollback at every step
Migration plan
EXAMPLE
MappedDependencies first
WeekendCutover
48hRollback
ZeroData loss goal
Example requests
File server → SharePoint & OneDriveMigrated
Line-of-business app → Azure VMMigrated
Exchange → Microsoft 365Migrated

Illustrative example: figures are project targets, not live metrics.

MappedDependencies, before anything moves
0Data loss target
2–8Weeks, estimated for a small business
48hRollback window at cutover
// why it goes wrong

A "lift and shift" gone wrong is expensive

Most failed migrations skip the discovery. An app moves, something it quietly depended on gets left behind, and the phones start ringing on Monday morning.

The rushed cutover

  • Hidden dependencies surface only after go-live
  • Unplanned downtime that runs into business hours
  • No tested way back if the cutover misbehaves
  • Old servers left humming and still being billed

The Cloudaid migration

  • Every dependency mapped before anything moves
  • Rehost or replatform decided workload by workload
  • Waves cut over out of hours, with a rollback ready
  • Old kit validated, decommissioned and signed off
// what's included

Every migration runs through the same steps

From the first discovery workshop to the day the server room is powered down, each workstream is scoped and owned.

Discovery & dependency mapping

We catalogue every server, app and data store, then map what talks to what, so nothing gets left behind at cutover.

Rehost vs replatform

A call per workload: lift as-is for speed, or replatform to managed services where it saves cost and admin later.

Network & identity design

VPN or ExpressRoute, address plans, DNS and identity (Entra ID or federation), sorted before the first workload moves.

Data migration & validation

File shares, databases and mailboxes moved with checksums and row counts reconciled. The numbers have to match.

Phased, tested cutover

We migrate in waves, out of hours, with each wave rehearsed and a rollback ready before anyone signs off.

Decommission & handover

Once the cloud is proven, old servers are wiped, decommissioned and documented, and runbooks are handed to your team.

// how it runs

Three phases, no surprises

We estimate two to eight weeks for a small-business on-premises migration, depending on server count. Every phase has a clear exit before the next begins.

Discover
01 phase
Weeks 1–2
  • Full inventory & dependency map
  • Rehost vs replatform per workload
  • Fixed-scope migration plan
MOST HANDS-ON
Migrate
02 phase
Weeks 3–6
  • Landing zone, network & identity built
  • Data migrated & reconciled in waves
  • Each wave rehearsed before cutover
Cut Over
03 phase
Weeks 6–8
  • Out-of-hours go-live, rollback ready
  • Hypercare & issue triage after go-live
  • Old kit decommissioned & handed over
// works with your stack
Microsoft 365
Azure
Google Workspace
// how we price it

What does an on-premises migration cost?

Every migration is quoted as a fixed-scope project, priced once we know your server count, data volume and how much you want replatformed. The discovery phase gives you that number before you commit to the move.

  • Fixed-scope project pricing with no open-ended hourly rates
  • Scoped in a short discovery call, quoted in writing
  • Optional managed cloud once you're live

Book a migration scoping call

On a short call we walk through your servers, apps and data. Then we come back with a fixed-scope plan and price for the move, before you commit to anything.

Book a scoping call
// pairs well with

Related services

On-Premises Migration works best as part of one connected platform.

Cloud Migration

Our full migration practice across every source and destination. On-premises moves are one part of it.

Managed Cloud

Once you're live, we run and optimise the new environment so it stays fast, secure and predictable.

Cloud Consulting

Landing zone design, architecture and roadmaps: the groundwork most on-premises migrations need.

Related guide

Cloud ERP Infrastructure: What Australian Business Needs

Every cloud ERP pitch talks about the software. Almost none of them talk about who's responsible for your backups, access control and data residency once you've signed.

// where we work

On-Premises Migration, Australia-wide

Sydney based, delivering remotely across Australia, with on-site visits in Sydney by arrangement. The same engineer and the same standards in every city.

HOME BASE

Sydney

Remote delivery, plus on-site visits by arrangement.

REMOTE

Australia-wide

Melbourne, Brisbane, Perth, Adelaide, Canberra and regional.

// questions

On-Premises Migration FAQs

What is on-premises to cloud migration?
It's moving the servers, applications and data you run in your own office or data centre into a cloud platform such as Azure or Microsoft 365. Done properly it starts with discovery and dependency mapping, decides whether each workload is rehosted or replatformed, cuts over in tested waves, and finishes by decommissioning the old hardware.
How long does a data centre migration take?
We estimate two to eight weeks for a small-business migration: roughly a fortnight of discovery and planning, a few weeks of building the landing zone and migrating data in waves, then cutover and decommission. Larger estates with more servers or complex applications take longer, and we scope the timeline in the discovery phase.
How much downtime will there be?
We plan cutovers out of hours, such as over a weekend by prior arrangement, so staff can arrive to a working system on Monday. Where a workload can't tolerate an outage, we stage the data ahead of time and aim to keep the switch itself to minutes, always with a tested rollback ready if anything looks wrong.
What's the difference between rehost and replatform?
Rehosting (lift and shift) moves a server to the cloud as-is. It's the fastest, lowest-risk option. Replatforming makes a modest change on the way, such as moving a database to a managed service or a file server to SharePoint, which cuts long-term cost and admin. We make that call per workload rather than forcing one approach on everything.
What happens to our old servers?
Nothing is switched off until the cloud is proven and you've signed off. After that we securely wipe the old kit, decommission it, and document the new environment with runbooks. That way you stop paying to power and cool hardware you no longer use.

Ready to leave the server room behind?

Book a no-obligation scoping call and we'll map your on-premises kit, then come back with a fixed-scope plan to move it.